Welcome to VitalPaintball Forum Sign in | Join | Faq

VitalPaintball Field Updates and Improvements

Started by admin at 09-15-2007 7:30 PM. Topic has 2 replies.

Print Search
Sort Posts:    
   09-15-2007, 7:30 PM
admin is not online. Last active: 12/6/2007 8:15:34 AM admin

Top 10 Posts
Joined on 08-10-2005
Posts 24
FIELD UPDATED

Attachment: LOGO.JPG
Reply Quote
FIELD UPDATE

Got some work done at the field and I thought I would update the teams. We built a hut at the control arm with shooting ports on all sides. This should make it much harder to take once a team has moved in. Along the side of the control arm we took the tape line that followed the road and moved it back and up the hill towards the red side. This added approximately 4 more wooded acres to the field. It incorporated 30 plus BIG trees to move behind, and we are now building multiple bunkers on the new areas. 10 more fireing crosses on the first and second floor, have been added to the fort and we are building a few more free standing walls behind the fort to bring the fight in closer from the wood line. Other changes are in the works and we will keep you posted of the changes as they happen. Hope to see everyone at the upcomming events even though the fall season is PACKED with events.

"VP"


   Report 
   10-15-2007, 5:23 PM
VitalPaintball is not online. Last active: 6/17/2008 2:52:41 AM VitalPaintball

Top 10 Posts
Joined on 08-31-2007
North Carolina
Posts 14
Re: FIELD UPDATED
Reply Quote
Next build is in the fort. We are adding rooms inside the fort itself. These are walls that can be moved after each scenario so that when you return, it wont be the same. This will bring into play close quarter battles and some extreme fighting,that is if you are brave enough to enter. We are adding more bunkers in the woods and we are adding a fuel Depot to the field. This will play a part in our scenarios. Come check us out.


"VP"
   Report 
   12-10-2007, 7:53 PM
admin is not online. Last active: 12/6/2007 8:15:34 AM admin

Top 10 Posts
Joined on 08-10-2005
Posts 24
Re: FIELD UPDATED
Reply Quote
Okay, the field re-design is complete and we are in the progress of building the new structures. Im sure you will like the changes.
"VP"
   Report 
VitalPaintball ... » General Paintba... » VitalPaintball ... » Re: FIELD UPDATED

Powered by Community Server, by Telligent Systems